Conceptual and preliminary design of facilities as necessary for the development of the banko barat feasibility study have been undertaken in accordance with the stated policies of the directorate general of mines and the republic of indonesia for projects of thid type.
The goverment of indonesia has obtained world bank loan 2153 IND for coal exploration and engineering services. The primary objective of the services is to identify the most appropriate site for a new mine, which is to feed coal to the suralaya thermal power station, and to prove the technical and economical feasibility of that mine.
The Government of indonesia, acting through the Director General of Mines of the Depatment of Mines and Energy, has contracted with kinhill-otto gold joint venture (K-OG) to provide consulting services for the south sumatra coal exploration project. Included in this project is the preparation of a feasibility study for the mining of coal from the pr…
The Volume reviews the impact of expansion of the Ombilin Coalfield on the selection of railway transportation system. The main objective of the review is to select an alternative for a more detailed analysis in the Milestone V Feasibility study which will examine the Financial viability of the proposed Ombilin II Coal Mine. The review considers a m…
This report is a engineering review of the new coal terminal that perum Tambang Batubara are designing at Teluk Bayur. The new terminal, Which Will replace the old outdate one currently in use, is being built to accommodate the output of the entire Ombilin coal field part of which is the Ombilin II Project. The objective of this review is to assess …
The ombilin II coal Mine Development and Trasportation project comprises the design of a new mine for the ombilin Coal field, the Ombilin II Mine, a coal marketing analysisi, an identification of the most appropriate railway route and a review of a new seaport terminal at Teluk Bayur, near padang in West Sumatra. The ultimate objective of the projec…
The objective of the Banjarsari Pre-Feasibility Study was to select an area suitable for development of an open cast mine within the Banjarsari syncline, which is situated between the Air Lematang in the west Air Enim in the east.
Arah kebijaksanaan perbatubara khusunya yang menyangkut perizinan usaha pertambangan, pencadangan dan sebagainya saat ini menjadi jelas sebagaimana diterbitkan dalam majalah pertambangan dan energi no. 3-1985, halaman 13-18.
The area convered by SKIP No. 20/SKIP/DP3/1985 is located in the western part of Aceh Special Region in North Sumatra, Indonesia (see Figure 1). The area is bounded by Longitude 96 derajat 15' in the east, and by the coastline to the west, plus the islands to the north of Banda Aceh (the capital of the special region). These islands are Pulau We, Br…