During the period under review,the project team leaaders re-assembled in Jakarta after the review meeting held in calgary in the moth of june, and axploration activities continued.
Untuk meningkatkan efisiensi mesin bor pembuat lubang tembak ("blasthole drilling machine",ROTAMEX), Power Shovel dan Shovel Loader di Tambang Terbuka Tanah Hitam, maka perum Tambang Batubara Ombilin merencanakan untuk merubah desain jenjang ("bench") yang semula tingginya 6 meter menjadi sekitar 11 meter. Dengan desain jenjang yang baru ini diharap…
The goverment of indonesia, acting through the director general of mines of the deparment of mines and Energy, has contracted with kinhill-otto gold joint department (K-OG) to provide consulting services for the south sumatra coal exploration project. included in this project is the preparation of a feasibility study for the mining and suooly of coa…
Conceptual and preliminary design of facilities as necessary for the development of the banko barat feasibility study have been undertaken in accordance with the stated policies of the directorate general of mines and the republic of indonesia for projects of thid type.
The goverment of indonesia has obtained world bank loan 2153 IND for coal exploration and engineering services. The primary objective of the services is to identify the most appropriate site for a new mine, which is to feed coal to the suralaya thermal power station, and to prove the technical and economical feasibility of that mine.
The Government of indonesia, acting through the Director General of Mines of the Depatment of Mines and Energy, has contracted with kinhill-otto gold joint venture (K-OG) to provide consulting services for the south sumatra coal exploration project. Included in this project is the preparation of a feasibility study for the mining of coal from the pr…
The Volume reviews the impact of expansion of the Ombilin Coalfield on the selection of railway transportation system. The main objective of the review is to select an alternative for a more detailed analysis in the Milestone V Feasibility study which will examine the Financial viability of the proposed Ombilin II Coal Mine. The review considers a m…