This report is a engineering review of the new coal terminal that perum Tambang Batubara are designing at Teluk Bayur. The new terminal, Which Will replace the old outdate one currently in use, is being built to accommodate the output of the entire Ombilin coal field part of which is the Ombilin II Project. The objective of this review is to assess …
The ombilin II coal Mine Development and Trasportation project comprises the design of a new mine for the ombilin Coal field, the Ombilin II Mine, a coal marketing analysisi, an identification of the most appropriate railway route and a review of a new seaport terminal at Teluk Bayur, near padang in West Sumatra. The ultimate objective of the projec…
The objective of the Banjarsari Pre-Feasibility Study was to select an area suitable for development of an open cast mine within the Banjarsari syncline, which is situated between the Air Lematang in the west Air Enim in the east.
Arah kebijaksanaan perbatubara khusunya yang menyangkut perizinan usaha pertambangan, pencadangan dan sebagainya saat ini menjadi jelas sebagaimana diterbitkan dalam majalah pertambangan dan energi no. 3-1985, halaman 13-18.
The area convered by SKIP No. 20/SKIP/DP3/1985 is located in the western part of Aceh Special Region in North Sumatra, Indonesia (see Figure 1). The area is bounded by Longitude 96 derajat 15' in the east, and by the coastline to the west, plus the islands to the north of Banda Aceh (the capital of the special region). These islands are Pulau We, Br…
Eksplorasi batubara dan penyelidikan gambut serta kegiatan pelayanan analisis fisika mineral dilakukan oleh Sub Direktorat Batubara dan Gambut. Untuk melaksanakan kegiatannya satuan kerja ini ditunjang oleh proyek inventarisasi dan eksplorasi mineral logam,industri,batubara dan Gambut. kegiatan eksplorasi batubara telah berlangsung diSumatra Tengah …
The quarter under review has been devoted to finalizing the design and engineering calculations for the Ombilin II mine, completing the engineering evaluations of the railway system, compiling capital and operating unit costs for both and report writing.