The central sumatra Geophysical wire line logging project under contract no. SCM 87-2 between Well surveys international, Inc., hereinafter referred to as WSI, and sumitomo coal mining co., ltd., assigned for contractor under N E D O., hereinafter referred to as sumitomo, began on 1 october 1987, and ended on 31 march 1988.
Dalam rangka menginventarisasikan endapan gambut di indonesia, DSM bekerjasama dengan USGS. Telah melakukan penyelidikan gambut di P. Bengkalis dan sekitarnya.
This is the report on the preliminary Exploration in the First stage of the central Sumatra Coal Exploration Project (CTA-156) carried out in the fiscal year 1986/1987. The purpose of the Preliminary Exploration in to select the two most suitable areas out of the three project areas consisting of Rokan, Cerenti including logas, and sinamar for furth…
After the decisions to select the Centiri Area for Semi-Detailed Explorations made by the Working Committee of the Central Sumatera Coal Explorations Project on June 6, and by the exclutive Council on June 8, 1987, the field work was commented on March 9, 1988.
Kegiatan eksplorasi proyek pengembangan pertambangan Batubara (P3B) didaerah Sumatra Selatan telah dimulai sejak tahun anggaran 1983/1984,di mana dalam kegiatan tersebut p3b bekerjasama dengan konsultan Kinhill-Otto Gold Joint Venture. Sampai dengan tahun anggaran 1986/1987 dari hasil kerjasama tersebut telah diperoleh 2 buah studi kelayakan untuk d…
salah satu sifat yang sangat dibutuhkan apabila batubara akan dimanfaatkan sebagai bahan bakar halus (pulverized) adalah sifat penggerusan (grindability)nya.
Dalam rangka pelaksanaan Proyek Pengembangan Pertambangan Batubara Di symatra Selatan, maka Direktorat Batubara untuk tahun anggaran 1986/1987 Pelita IV, telah mengadakan pemetaan geologi detail didaerah Arahan Selatan, tepatnya dibagian barat laut dari daerah Arahan Selatan, (Sumatera Selatan). Pemetaan geologi ini merupakan pekerjaan lanjutan peme…