Map P1.XVI, to a scale of 1 : 12500, has been surveyed with the boussole tranche nontagne, as to the main ecasurements, while the interosediary measurements have bean done with measuring-chain and had-compass.
Along the west ocast roads usually can be used for heavy traffic, especially the main road through maros, Pangkajene Tanette to pare-pare.Secondary roads which run eastward are available, i.e from maros. to patanoaeang Asoe and from Pangkajene.