According to "GIPROKOKS" (Institute for designing coking plants) to supply and iron and steel of 250.000 tons steel per year with coke 500.000 tons of coal will be required.
Accordin to "GIPROKOKS" (Institute for designing coking plants) to supply and irom and steel plant of 250.000 tons steel per year with coke 500.000 tons of coal will be required. Besides that additional 250-000 tons par year will be needed for the power station, 25.000 KW and mine auxiliaries.