Preliminary Report For The Months Of October, November and December Of The year - 1929
From the 6th of october to the 27th of december fisldworks were done by writer of this report in the tertiary strip between. S. Belajan (S. Tabang) and S. Telen; additional reconnsissances west of the S. Belajan between S. Ritan and S. Bengen, right tributariss of the S. Belajan.
Ketersediaan
#
Pusat Sumber Daya Mineral, Batubara dan Panas Bumi - Jln. Soekarno Hatta No. 444, Bandung, Jawa Barat
PMB LF 1963 - 3
PMB LGLF00070
Tersedia
Informasi Detail
Judul Seri
-
No. Panggil
PMB LF 1963 - 3
Penerbit
Bandung :
Pusat Sumber Daya Geologi.,
1963
Deskripsi Fisik
57 halaman, tidak berwarna, tidak ada lampiran pet