Ombilin II Coal Mine Development And Transportation Project, Conceptual Report Volume V Railway Analysis
The Volume reviews the impact of expansion of the Ombilin Coalfield on the selection of railway transportation system. The main objective of the review is to select an alternative for a more detailed analysis in the Milestone V Feasibility study which will examine the Financial viability of the proposed Ombilin II Coal Mine. The review considers a maximum throughput of 2.1 million tonnes per annum of coal that will be produced from a combination of proposed ombilin II project and those mines comprising ombilin III, Which may be considered feasible.
Ketersediaan
#
Pusat Sumber Daya Mineral, Batubara dan Panas Bumi - Jln. Soekarno Hatta No. 444, Bandung, Jawa Barat
PMB LA 1986-22