Due to the slow progress of the drilling program it became abvious that the program has to be reviewed and a priority squence of the propesed drill holes has to be established in order to have a minium new geological information input available before the start of the feasibility study.
This addendum report containes three part all relating to mine design consideration .thet have been prepared to document results of evaluations undertaken to support the choice fo an optimum mining plan ,supported by an adequate reserve base.